NEWS & UPDATES

Connecticut Orthopedic Specialists in Branford

Connecticut Orthopedic Specialists in Branford is a multi-phase medical project with both renovation to the existing facility and a new addition. The facility provides orthopedic healthcare to adults and children including urgent care walk-in, MRI, physical therapy and surgical procedures. In the first two phases of work, Controlled Air, Inc....
Read More about Connecticut Orthopedic Specialists in Branford

Backus Hospital Annex Split

Backus Hospital required a ductless split system in the annex building at the main hospital location. We installed a 3-top multi-zone split system with one outdoor unit with high heat output and low ambient with three wall mounted indoor units. We also installed programmable thermostats and electical. See Our Entire...
Read More about Backus Hospital Annex Split

YMCA Wilton

Wilton YMCA wanted to convert their oil boiler to natural gas. Controlled Air, Inc. was able to replace the burner and pipe in natural gas. They choose a flexible Trac-pipe saving a few thousand dollars. We reused the existing controls and reconnected the existing electrical feeder. See Our Entire Client...
Read More about YMCA Wilton

Winter Tips

Clear off roof hatches of snow and ice. If hatches are not cleared and there is an emergency we will not be able to access the roof. Clear snow & ice away from heat pumps. Heat pumps can freeze, causing improper functioning. If you run A/C in the winter due to...
Read More about Winter Tips

NEWS CATEGORIES