Municipal Buildings
Middletown Recreation Center
The Middletown Recreation Center had is soft grand opening on Monday, January 9th. In this recent update, Controlled Air worked with Clarke Energy to create a energy efficient solution integrating multiple products including YANMAR CHP. More information will be provided soon.
View MoreNaugatuck High School
A recent article in Combined Heat and Power Magazine highlighted an energy project at Naugatuck High School. Controlled Air Inc. worked with Advanced Energy Efficiencies to develop a cogeneration installation that will provide 140 kW of electrical power and 820,000 Btus of hot water supply. Advanced Energy Efficiencies put together a highlight video giving a…
View MoreChristian Community Action New Haven
Christian Community Action, a non-profit located in New Haven, CT provides shelter for the homeless. They recently called for loss of heat. Upon inspection we determined that there were issues with their current boilers. One boiler was dead the other one was acting up. After discussing options, including high efficiency versus standard efficiency, they decided…
View MoreBridgeport Microgrid
The Bridgeport Microgrid was acquired by Scale Microgrid Solutions in 2021. Bridgeport Microgrid is a partnership between OR&L Construction in Branford, Controlled Air and Power Island Energy in Jacksonville, Fla. Controlled Air, Inc. will be in charge of the design build concept. This includes the design and installation of the Congeneration System, chilled water system,…
View MoreBethel Library
In the Bethel Library we completed a second floor tenet fit out. We installed an entire building controls system which included lighting, and air handlers. Their existing heating and lighting system was either continuously on or continuously off. Their system was wasting both money and energy. In the new controls system, sensors register room occupancy so that…
View MoreUnion Plaza Roof Top Replacement
Union Plaza had mismatched, inefficient, and past expectancy roof top units. We installed new high efficiency units and received incentives and rebates that helped pay for a good portion of the project. The new unit was so large the we had to install cat walks for installation and service. We also upgraded the VAV boxes…
View MoreFairfield Police Station Trigeneration
We installed a new TecoGen CM-50 50 kW gas fired Cogeneration unit. We also furnished and installed gas lines, make-up water lines, radiator piping, hot water piping, heat exchanger, circulators, and electrical conduit to make the cogeneration operational and running efficiently. We updated the controls system with wiring to integrate the cogeneration system into the…
View MoreJudicial Branch, 920 Broad St.
The Hartford Judicial Branch, Juvenile Court House needed to replace their existing Baltimore Air Coil Cooling Tower, which was badly rusted and falling apart. We installed a new Baltimore Air Coil Cooling tower with a variable frequency drive speed controller, installed new controls, refurbished the cooling tower steel support and converted the water bypass valve.…