HVAC

Pomperaug High School

Pomperaug High School has been a long time customer of Controlled Air Inc. We have had many projects over the years. We currently have two large projects in process. One is the pool room complete renovations and the second is updating the heating for the gym. Details will be coming...
Read More about Pomperaug High School

St. Joseph’s High School

St. Joseph's High School was looking for an energy efficient way to manage their heating and cooling for their gym and chapel. They had main three criteria to solve their HVAC requirements. The school needed to provide cooling to the entire school. Any additional equipment added to their current HVAC...
Read More about St. Joseph’s High School

Sharon Hospital HVAC Upgrades

Sharon Hospital HVAC Upgrades Throughout the hospital Controlled Air, Inc. provided the following work: Fire Dampers, Air registers and diffusers, Hot water VAVs and associated piping, Ductwork, as well as Johnson controls BMS and wiring. The behavioral health unit in Sharon Hospital provides short-term psychiatric care of patients 55 and...
Read More about Sharon Hospital HVAC Upgrades

West Haven Veterans Museum

The West Haven Veterans Museum located on Terrace Street in West Haven was built to honor then men and women who have served our Country in time of conflict and natural disaster. The museum’s goal is to focus on patriots from Connecticut and to show they survived. They are a...
Read More about West Haven Veterans Museum

Hartford Hospital Histology

For this project we needed to set up a new lab in an existing hospital space. There was a lot of intricacy, coordination and planning to work inside a functioning hospital that allowed for no downtime. The exhaust fan was 3 floors down and autopsy and tissue sampling was using...
Read More about Hartford Hospital Histology

Backus Hospital Plainfield

Backus Hospital in Plainfield is a two story medical facility that was completed in three parts.The first floor had exam rooms, pharmacy and a cytotoxic laboratory, which required HEPA filtration, strict pressure monitoring, alarming, custom displays and hood certification for bio hoods. The second floor has three operating rooms with...
Read More about Backus Hospital Plainfield

1010 Washington Blvd, Stamford Roof Top Unit Replacement

We replaced a 105-ton RTU, reconnected controls and balanced the unit. Because of the size of the unit and the height of the building, the replacement was performed over the weekend and we had to close down a city block.
Read More about 1010 Washington Blvd, Stamford Roof Top Unit Replacement

Sharon Hospital

Sharon Hospital Pharmacy upgrades required compliance with state and federal regulations for air flow, pressure and humidity. As any pharmacy must be a cleanroom as defined in ISO standard 14644, "a room in which the concentration of airborne particles is controlled, and which is constructed and used in a manner...
Read More about Sharon Hospital

Castle Rock Condominiums

The Castle Rock Condominium project will be done in two phases. There are a total of 45 roof tops units that require replacement. We recently replaced 23 and will complete the change out process later in November. The project includes disconnection, removal of 45 old out dated RTU's and installation...
Read More about Castle Rock Condominiums

Endoscopy Center

The Endoscopy Center was a large job with a very quick turn-around. A project of this size would typically take 3-4 weeks to complete but because of the requirements of the center we had to have the job complete within one week. The project included demolition of older ductwork; installation...
Read More about Endoscopy Center

News Categories