Cell Tower Upgrades for Verizon

We are providing air conditioning replacements and upgrades to remote based cell sites all over Connecticut. Many of these replacements are custom design build to fit specific locations such as basements, roofs or in the middle of an office building. We are removing old R-22 unit and replacing them with...
Read More about Cell Tower Upgrades for Verizon

Kerite

Controlled Air, Inc. removed six old 25-ton rooftop units. Six new, high efficiency Carrier 25-ton units which were installed, as well as smoke detectors, control wiring, and condensate drain piping. The new units fit in the locations of the old units perfectly, so no adapter curbs were required. Overall a...
Read More about Kerite

New England Air Museum

New England Air Museum has been a customer of Controlled Air, Inc. for a few years now. In this latest project, we added air conditioning to two buildings where airplanes are displayed. What was special about this project is they did not want the units blocking the displays or impacting...
Read More about New England Air Museum

PCC Structurals, Groton

PCC Structurals Wax Room Chiller - An aging process chiller put the production capabilities of PCC Structurals at risk so they turned to Controlled Air, Inc. to design and build a new process cooling system. Controlled Air, Inc. recommended installing a new chiller on the roof so a steel support...
Read More about PCC Structurals, Groton

Stony Creek Brewery

Stony Creek Brewery was new construction. We worked in combination with Pat Munger Construction and Joseph T Sepot Architects. Controlled Air, Inc. installed 3 gas/electric roof top units with curbs and economizers, 4 ignition gas fired heaters, dampers, one split system, electric baseboard heating, duct work distribution system, piping, controls...
Read More about Stony Creek Brewery

Webster Bank Arena

At the Webster Bank Arena, Controlled Air, Inc. replaced two boilers which had a gross output of 4,334 MBH and an operating efficiency of 79% with two new high efficiency Sonic SC-4000 Patterson-Kelley boilers. The Sonic 4000 boiler has a gross output of 3,840 MBH and an AHRI thermal efficiency of 96.0%....
Read More about Webster Bank Arena

Knotter Drive

The Knotter office building required a complete rebuild. The front entry needed to be redesigned because they had taken over the whole building and previously there had been multiple companies within the space. The heating and cooling was a challenge because the entryway was made mostly of glass, making so...
Read More about Knotter Drive

Bethel Library

In the Bethel Library we completed a second floor tenet fit out. We installed an entire building controls system which included lighting, and air handlers. Their existing heating and lighting system was either continuously on or continuously off. Their system was wasting both money and energy. In the new controls...
Read More about Bethel Library

Augustana Homes

Augustana Homes required a hot water and domestic, heating boiler replacement. New pumps throughout. New boiler plant and new controls. A New chimney flue  for a 10 story pipe. They received no incentives this time, but still chose a high efficiency boilers
Read More about Augustana Homes

Rochambeau Elementary School

Region 15 Schools had old, inefficient oil fired burners for two existing boilers. We furnished and installed two Powerflame gas fired burners and made the necessary modifications to mount the burners. We were required to run new gas line from the meter, across the roof and down into the boiler...