Pharmaceutical Laboratory Installation

Pharmaceutical Laboratory Controls

December 7, 2017

Controlled Air, Inc. installed a Building Control System (BMS) for a pharmaceutical laboratory and office building allowing for proper operation and sequencing. The BMS was integrated with installed mechanical and process equipment. The…

Read More
Castle Rock Condominiums Roof Top Change Out

Castle Rock Condominiums

November 9, 2017

The Castle Rock Condominium project will be done in two phases. There are a total of 45 roof tops units that require replacement. We recently replaced 23 and will complete the change out…

Read More
The Endoscopy Center, Hamden CT

Endoscopy Center

October 27, 2017

The Endoscopy Center was a large job with a very quick turn-around. A project of this size would typically take 3-4 weeks to complete but because of the requirements of the center we…

Read More
Verizon Cell Tower Upgrades

Cell Tower Upgrades for Verizon

October 10, 2017

We are providing air conditioning replacements and upgrades to remote based cell sites all over Connecticut. Many of these replacements are custom design build to fit specific locations such as basements, roofs or…

Read More
Preparing for storm season

Preparing For Storm Season

October 5, 2017

Hurricane Straps/Clips Hurricane straps are designed to secure a rooftop unit to a roof curb. By doing this, the rooftop unit is more likely to withstand high wind gusts, thereby reducing the chance…

Read More
Kerite, Seymour installation of new RTU installation

Kerite

September 14, 2017

Controlled Air, Inc. removed six old 25-ton rooftop units. Six new, high efficiency Carrier 25-ton units which were installed, as well as smoke detectors, control wiring, and condensate drain piping. The new units…

Read More
New England Air Museum Air Conditioning

New England Air Museum

September 6, 2017

New England Air Museum has been a customer of Controlled Air, Inc. for a few years now. In this latest project, we added air conditioning to two buildings where airplanes are displayed. What…

Read More
HVAC Summer maintenance

Summer HVAC Maintenance and Service

August 4, 2017

Regular Summer Maintenance helps your system run efficiently and with less problems. When you have a service contract with Controlled Air, Inc. we check your systems seasonally to make sure they are running…

Read More
PCC Structurals

PCC Structurals, Groton

August 2, 2017

PCC Structurals Wax Room Chiller – An aging process chiller put the production capabilities of PCC Structurals at risk so they turned to Controlled Air, Inc. to design and build a new process…

Read More
Stony Creek Brewery, Branford CT

Stony Creek Brewery

June 13, 2017

Stony Creek Brewery was new construction. We worked in combination with Pat Munger Construction and Joseph T Sepot Architects. Controlled Air, Inc. installed 3 gas/electric roof top units with curbs and economizers, 4…

Read More
Bridgeport Microgrid

Bridgeport Microgrid

December 10, 2016

The Bridgeport Microgrid was acquired by Scale Microgrid Solutions in 2021. Bridgeport Microgrid is a partnership between OR&L Construction in Branford, Controlled Air and Power Island Energy in Jacksonville, Fla. Controlled Air, Inc.…

Read More

Update on R-22 Replacements

December 5, 2016

R-22 Replacements R22 Replacement – As we had previously reported, the price of R22 continues to rise. Since the start of the summer season, we’ve seen the wholesale price of R22 jump over…

Read More